It was possible to demonstrate the utility of BIM technology, not only for the design phase development, but also to give a follow-up to the constructive process, and once the works are completed, as was the analyzed case, to follow the maintenance plan activities and schedules. From the modeling point of view, this brings with it great benefits.
