In a constantly changing field like construction industry, BIM represent the last revolution, which is deeply changing the whole process, from the design phase to the facility manage during all the life cycle. In this scenario was developed this thesis, operating in a sensible facility such as healthcare complex like Trompone, where BIM was applied, firstly to have a restitution of the facility through shaping the state of affairs, creating a complex haring strategy constituted basically by federated files and point clouds surveys, aimed to organize many actors working at the same project, providing a common data environment following the British standard. In this context was developed the Winter Garden Project, placed in a facility courtyard, creating a 4D and 5D model, that represent the BIM strength, implementing the alphanumeric information degree applicable to the model, and using it to have a direct correspondence with the construction time schedule and a cost report, through the redaction of a Gantt chart, implemented by the addition of human and material resources. The results expected by he data implementation of the project, are to have a better management especially during the building site phase, for what concern costs and timing, detecting the project also during the construction phase, that allows a complete knowledge and the possibility to modify some aspects during construction, which aim is the improvement of the construction process.